Upper Floors of the Building

I’ve been working hard over the last couple days on my building’s upper floors. The first floor is the most detailed, but this building has 3 more floors above that consisting of several windows, fire escapes, and some very detailed decorative molding on the top of the building.

I’ve completed most of that. The decorative molding is done. The windows are mostly done except for some more detailed pieces that I will do in a second pass IF I have time. The fire escapes took a lot more work than I had anticipated so they are only about half done in this shot. The stairs connecting them as well as the ladder has yet to be completed.

building_render3%

Leave a Reply